Irvine Hauling and Transfer Station

1/15/2016

 

Description of Project:

Irvine Hauling & Transfer Station is a fully operational waste hauling and waste transfer facility. Pride assisted the site with the installation of Phase I stormwater upgrades. Phase I consisted of install of trench drains to prevent stormwater runoff at the exit gates, install of a stormdrain piping, concrete inlet/overflow structures and Filtrexx Soxx install.
Phase I Stormwater Upgrades
Filtrexx Soxx Install

Scope of Work Performed:

  • Demolition of existing concrete features
  • Removal and disposal of cement treated base
  • Install of two (2) ACO S300K trench drains at two (2) different gates
  • Install of 10-inch and 4-inch PVC below grade stormdrain piping
  • Form/pour two (2) concrete stormdrain inlet/overflow structures
  • Install of Filtrexx Soxx at various locations around the site

Project Successes:

  • Maintained project schedule while working around onsite operations. Pride’s work was performed during normal work hours, which required substantial coordination of activities with operations
  • Field crews were able to provide client with actual field elevations/conditions to redesign stormdrain outlets at the street
  • Worked successfully with the City of Irvine to conform with the encroachment permit requirements
  • Project was completed on schedule and within the client’s original budget
Redesign Stormdrain Outlet
Picture

Additional Info:

Location: Irvine, CA
Project Super: Adam Wenzel – (714) 465-8108
Project Manager: Todd St. Peter – (714) 240-4983
Actual Date of Completion: January 2016
Request More Info

Comments are closed.
Picture

Home

About

Services

Projects

Contact

Copyright © 2019   |   714-240-4983   |   todd.stpeter@prideconstructionservices.com​
  • Home
  • About
  • Services
  • Projects
  • Contact