Description of Project:Irvine Hauling & Transfer Station is a fully operational waste hauling and waste transfer facility. Pride assisted the site with the installation of Phase I stormwater upgrades. Phase I consisted of install of trench drains to prevent stormwater runoff at the exit gates, install of a stormdrain piping, concrete inlet/overflow structures and Filtrexx Soxx install. |
Scope of Work Performed:
|
Project Successes:
|