Carlsbad Hauling & Limited Transfer Station
Description of Project:Carlsbad Hauling & Limited Transfer Station is a fully operational waste station. Pride assisted the site with the installation of Phase I stormwater upgrades. Phase I consisted of install of trench drains to prevent stormwater runoff at the exit gates, install of a stormwater basin, a percolation pipe trench line system, construction of a CMU wall outlet with filters, catch basin filter upgrades, bollard install and install of a new stormwater sampling port.
|
Scope of Work Performed:
|
Project Successes:
|
Additional Info:Location: Carlsbad, CA
|