El Cajon Hauling, Transfer & Recycling Station

9/1/2015

 

Description of Project:

El Cajon Hauling, Transfer & Recycling Station is a fully operational waste facility. Pride assisted the site with the installation of Phase I stormwater upgrades. Phase I consisted of removal and replacement of drive approaches to prevent stormwater runoff, bioswale systems, modifications of existing stormdrain inlets, concrete spillways, controlled construction exit, wood curbing around perimeter of site, demolition of hardscape and landscape features and install of Filtrexx Soxx at various locations around the site.
Picture
Picture

Scope of Work Performed:

  • Construct north, west and south bioswales (3 different locations), including install of various aggregates, sand and non-woven geotextile
  • Removal and replacement of two (2) concrete drive approaches which included rolled berms/gutter features to prevent stormwater runoff
  • Form/pour three (3) different concrete spillways with Filtrexx Soxx systems
  • Modified five (5) existing stormdrain inlets, including removal and replacement of filter systems upgrades
  • Install wood planks along perimeter of site to prevent stormwater runoff
  • Install Filtrexx Soxx at eight (8) different locations, including securing filters in-place with stainless steel straps
  • Maintenance of perimeter drainage channels

Project Successes:

  • Pride was able to expedite work at two (2) active drive approaches by changing hours of work and using a high early strength concrete, which prevented impacts to site operations
  • Pride field staff worked with city officials to modify the original bioswale design at the property easement area. Positive work relations along with active communications by Pride assisted with completion of the work.
  • Project was completed ahead of schedule and on budget
Picture
Picture

Additional Info:

Location: El Cajon, CA
Project Super: Adam Wenzel – (714) 465-8108
Project Manager: Todd St. Peter – (714) 240-4983
Actual Date of Completion
: September 2015
Request More Info

Comments are closed.
Picture

Home

About

Services

Projects

Contact

Copyright © 2019   |   714-240-4983   |   todd.stpeter@prideconstructionservices.com​
  • Home
  • About
  • Services
  • Projects
  • Contact