Description of Project:

Pride assisted the client with remedial grading of approx. 17-acres of existing landfill cover materials, along with construction of a 3,000-LF perimeter swale. Prides construction efforts included mass excavation and earthwork hauling, cut and fill earthwork operations, fine grading, install of 36-inch drainage piping, riprap reinforcement along channel embankment and installation of crushed miscellaneous base/asphalt paving.
Remedial Grading
Mass Excavation

Scope of Work Performed:

  • Mass excavation and cut/fill grading operations
  • Cut/fill grading of perimeter drainage channels
  • Install of riprap within perimeter channel area
  • Install of 260-LF of 36-inch CSP pipe
  • Construction of roadway crossing
  • Fine grading of 17-acres
  • Asphalt paving of roadway crossing

Project Successes:

  • Maintained project schedule while working 11-day continuous shifts
  • Pride field crews assisted client with design of drainage piping to accommodate for elevation differences from the original plan
  • Project was completed ahead of schedule and on budget
Las Vegas

Additional Info:

Location: Las Vegas, CA
Project Super: Adam Wenzel – (714) 465-8108
Project Manager: Todd St. Peter – (714) 240-4983
Actual Date of Completion: November 2016
Request More Info

Comments are closed.
Picture

Home

About

Services

Projects

Contact

Copyright © 2019   |   714-240-4983   |   [email protected]​
  • Home
  • About
  • Services
  • Projects
  • Contact