Description of Project:South Gate Hauling & Transfer Station is a fully operational waste handling facility. Pride provided installation of stormwater upgrades for the facility. Stormwater upgrades included install of an underground stormwater infiltration and discharge system. The project required mass excavation and grading, install of perforated corrugated metal piping, concrete inlet structures, numerous concrete stormwater control structures and concrete/asphalt reinstall. | |
Scope of Work Performed:
|