Pride Construction Engineering Services
  • Home
  • About
  • Services
  • Projects
  • Contact

GI Industry Hauling & Transfer Station

3/5/2018

 

Description of Project:

GI Industry Hauling & Transfer Station is a fully operational waste handling facility. Pride provided install of final stormwater upgrades for the facility. Stormwater upgrades included install of an underground stormwater infiltration and discharge system. The project required mass excavation and grading, install of perforated corrugated metal piping, concrete inlet structures, numerous concrete stormwater control structures and concrete/asphalt revitalization.

Read More

El Sobrante Stormwater NONA Basins

3/5/2018

 

Description of Project:

 El Sobrante Landfill soil borrow area is a non-active mining facility. Pride provided construction of storm-water ponds and install of storm-water control features. Construction of storm-water ponds included mass excavation and fill placement, in order to build five (5) different holding ponds (Ponds 1A-4A & 2). Pond construction also included discharge piping/dewatering devices. Riprap armor and concrete structures were added as storm-water controls features.
El Sobrante Landfill

Read More

South Gate Hauling & Transfer Station

1/9/2017

 

Description of Project:

South Gate Hauling & Transfer Station is a fully operational waste handling facility. Pride provided installation of stormwater upgrades for the facility. Stormwater upgrades included install of an underground stormwater infiltration and discharge system. The project required mass excavation and grading, install of perforated corrugated metal piping, concrete inlet structures, numerous concrete stormwater control structures and concrete/asphalt reinstall.

Read More

Nellis AFB Landfill Grading

12/21/2016

 

Description of Project:

Pride assisted the client with remedial grading of approx. 17-acres of existing landfill cover materials, along with construction of a 3,000-LF perimeter swale. Prides construction efforts included mass excavation and earthwork hauling, cut and fill earthwork operations, fine grading, install of 36-inch drainage piping, riprap reinforcement along channel embankment and installation of crushed miscellaneous base/asphalt paving.
Remedial Grading

Read More

El Sobrante Landfill Truck Wash Station

6/2/2016

 

Description of Project:

El Sobrante Landfill located in Corona, California is a fully operational waste landfill facility. Pride constructed a new industrial size concrete heavy hauler truck wash for the site. The project assists trucks with the removal of sediment prior departure from the site, to assist with stormwater quality improvement. Work included cut/fill grading, fine grading, construction of concrete structures, asphalt work and various erosion and sedimentation control features.

Read More

McKittrick Waste Treatment Site Stormwater Upgrades

3/1/2016

 

Description of Project:

McKittrick Waste Treatment Site is a fully operational waste landfill. Pride assisted the site with the installation of new stormwater drainage features along the southwestern property boundaries. Pride construction efforts included mass excavation and earthwork hauling, cut and fill earthwork operations, install of dual barrel box culverts, riprap channels, concrete cut-off wall, concrete headwalls and installation of crushed miscellaneous base/asphalt paving.

Read More

Compton Hauling Station

12/1/2015

 

Description of Project:

Compton Hauling Station is a fully operational waste hauling station. Pride assisted the site with installation of Phase I stormwater upgrades. Phase I consisted of pothole investigation, install of a trench drain at the front entrance gate to prevent runoff, installation of stormwater basins, stormdrain piping, concrete drive approaches, construction of concrete outlet boxes with filters and catch basin inlet filter upgrades.
Picture

Read More

Atascadero Waste Alternative Station

11/1/2015

 

Description of Project:

Atascadero Waste Alternative Station is a fully operational waste hauling station. Pride assisted the site with the installation of stormwater upgrades. Work consisted of mass grading and excavation of a stormwater basin, installation of stormdrain piping and catch basins, water line repairs, concrete curbing, concrete spillway and install of rumble plates at the front entrance of site.
Picture

Read More

El Cajon Hauling, Transfer & Recycling Station

9/1/2015

 

Description of Project:

El Cajon Hauling, Transfer & Recycling Station is a fully operational waste facility. Pride assisted the site with the installation of Phase I stormwater upgrades. Phase I consisted of removal and replacement of drive approaches to prevent stormwater runoff, bioswale systems, modifications of existing stormdrain inlets, concrete spillways, controlled construction exit, wood curbing around perimeter of site, demolition of hardscape and landscape features and install of Filtrexx Soxx at various locations around the site.
Picture

Read More

Carlsbad Hauling & Limited Transfer Station

9/1/2015

 

Description of Project:

Carlsbad Hauling & Limited Transfer Station is a fully operational waste station. Pride assisted the site with the installation of Phase I stormwater upgrades. Phase I consisted of install of trench drains to prevent stormwater runoff at the exit gates, install of a stormwater basin, a percolation pipe trench line system, construction of a CMU wall outlet with filters, catch basin filter upgrades, bollard install and install of a new stormwater sampling port.
Picture

Read More
Picture

Home

About

Services

Projects

Contact

Copyright © 2019   |   714-240-4983   |   todd.stpeter@prideconstructionservices.com​
  • Home
  • About
  • Services
  • Projects
  • Contact